Saturday, September 27, 2008

Serayu



The 36 m high and 96 long crest length Garung (Indonesia) concrete gravity dam on Serayu river for
Hydroelectric Power Plant 26.40 MW (1964-1971 as Head of Civil Engineering Dept and 1976-1982 as Technical Chief of Staff)

Sri Lanka 1984




The 107 m high and 620 m long crest length Kotmale concrete face rockfill dam on Kotmale River, Sri Lanka for HEPP of 210 MW (1984)

Taiwan 1993

The 122.50 m high and 510 m long crest dam Feitsui concrete arch dam on
Peishih river for HEPP of 70 MW, Taiwan (1993)

The Great Wall of China in Beijing (1993)


The Powerhouse of Mrica HEPP (as Project Manager)


THE ASIAN CONTINENT






The 110 m high and 6,572 m long crest dam of Mrica rockfill dam on Serayu River for Hydroelectric Power Plant (HEPP) of 164.50 MW (1976-1982 as Operation and Logistic Chief of Staff 1982-1988 as project manager). This dam is the longest dam in Indonesia. The only PT. PLN using Owner’s Leading and as Chief of Mrica HEPP Coordinating Committee. Feasibility study by Snowy Mountain Engineering Co. (Australia), Detail Design by Technopromexport (Sovyet Union). During construction : Design Consultant Sweco (Sweden), Engineering and Power Development Consultant (UK), PT. Wiratman (Jakarta). Supervising Engineers : Sir William Halcrow (UK), Beca Worley Int. (New Zealand) and PT. Citaconas (Jakarta). Contractor : Skanska (Sweden), Asea (Sweden), Balfour Beatty (UK) Consortium. Time 1982-1989, with rescheduling 9 months.

Monday, September 22, 2008

My Profile


Senior Lecturer of : Department of Civil Engineering, Civil Engineering and Planning Faculty, University of Trisakti, Jakarta – Indonesia.
Senior Professional of Indonesian Association of Hydraulic Engineers
Senior Professional of Indonesian National Committee on Large Dams
Senior Professional of Indonesian of Prossesional Elektrical Engineers
As Trainees : Hydroelectric Power Engineering (Japan, 1971), Economic & Engineering for Electric Utilities (USA, 1975-1976), Workshop on Design of Fill type Dam (Malang, 1977), Feasibility Study for HEPP (Japan, 1980), Resolving Construction Claim (Singapore, 1982), Pricing Construction Claims according to FIDIC (Singapore, 1984), Executive Construction Management (Sweden & UK 1986), Hydro Power Development (Sweden, 1987), Instrumentation, Monitoring and Safety Inspection (Ireland & Swiss, 1995).
International Conference Speaker : Rio de Janeiro (1982), Stockholm (1987), Hong Kong (1992), Bangkok (1992 & 1994), Beijing (1993), Budapest (1994), Kuala Lumpur (1996).

AWARD :
1963 The best graduated Bachelor of Civil Engineering, from the Dean of Technical Faculty University of Gadjah Mada, Yogyakarta.
1980 sixteen years in services, from the President Director of PT. PLN.
1988 twenty four years in services, from the President Director of PT. PLN.
1992 Satya Lencana Pembangunan, from the President of The Republic of Indonesia.
1996 thirty two years in services, from the President Director of PT. PLN.
2005 ten years in services, from the President University of Trisakti.