The 110 m high and 6,572 m long crest dam of Mrica rockfill dam on Serayu River for Hydroelectric Power Plant (HEPP) of 164.50 MW (1976-1982 as Operation and Logistic Chief of Staff 1982-1988 as project manager). This dam is the longest dam in Indonesia. The only PT. PLN using Owner’s Leading and as Chief of Mrica HEPP Coordinating Committee. Feasibility study by Snowy Mountain Engineering Co. (Australia), Detail Design by Technopromexport (Sovyet Union). During construction : Design Consultant Sweco (Sweden), Engineering and Power Development Consultant (UK), PT. Wiratman (Jakarta). Supervising Engineers : Sir William Halcrow (UK), Beca Worley Int. (New Zealand) and PT. Citaconas (Jakarta). Contractor : Skanska (Sweden), Asea (Sweden), Balfour Beatty (UK) Consortium. Time 1982-1989, with rescheduling 9 months.