The 36 m high and 96 long crest length Garung (Indonesia) concrete gravity dam on Serayu river for
Hydroelectric Power Plant 26.40 MW (1964-1971 as Head of Civil Engineering Dept and 1976-1982 as Technical Chief of Staff)
Hydroelectric Power Plant 26.40 MW (1964-1971 as Head of Civil Engineering Dept and 1976-1982 as Technical Chief of Staff)
No comments:
Post a Comment